Tufts University Pearson Chemistry Lab

P.J. Dionne Company continues its collaboration with Elaine Construction on the upgrades to Tufts University's Pearson Chemistry Lab in Medford.

This project includes the installation of specialized lab sinks equipped with RODI; reverse osmosis deionized. As well as protected and tempered water, and a natural gas system serving the lab with a dedicated emergency shut-off valve. These enhancements support the functionality of the chemistry lab, ensuring a safe and efficient environment for students and researchers.

Location

Somerville, MA

Size

4,000 sq. ft.

General Contractor

Elaine Construction Company

MEP Engineer

Cannon Design

Architect

Cannon Design