Lesley University Reed Burnham Hall

Complete interior demolition of two buildings at Lesley University. On the exterior, the scope of work includes new slate roofs, rebuilding of masonry chimneys, window replacement, and installation of a connector bridge to join the two buildings. On the interior, the scope of work includes a new elevator and all-new VRF systems which are water-cooled and tied into the campus Chilled Water System.

The renovated building will be a student center for Lesley University. We provided coordinated HVAC trades on this project on behalf of the general contractor.

Location

Cambridge, MA

Size

18,700 sq. ft.

General Contractor

Shawmut Design and Construction

MEP Engineer

ARUP

Architect

Centerbrook