P.J. Dionne Company is pleased to be selected a second time as the plumbing contractor for the renovation and expansion of the Conservatory Lab Charter School’s lower school campus on Hancock Street in Dorchester, MA.
Our team is installing plumbing infrastructure, including rain leaders with overflow drainage, bathrooms, a commercial kitchen, bottle-filling stations, and classroom sinks. This project requires careful coordination to ensure minimal disruption within the renovated 19,000-square-foot building and the new 6,000-square-foot addition.
Location
Dorchester, MA
Size
25,000 sq. ft.