Accent Therapeutics

P.J. Dionne Company completed a fast-paced laboratory project for Accent Therapeutics. The work included prefabrication of plumbing systems such as new water racks and new gas piping for the generator, as well as a variety of lab gas systems, including nitrogen, CO2, and compressed air.

To ensure seamless operation, in-depth testing was performed to confirm system integrity and leak-free performance. This project also required careful coordination with the existing core and shell plumbing systems.

Location

Lexington, MA

Size

65,000 Sq. Ft.

General Contractor

Callahan Construction Managers

MEP Engineer

AHA Engineers

Architect

Vivo Architecture