P.J. Dionne Company completed a fast-paced laboratory project for Accent Therapeutics. The work included prefabrication of plumbing systems such as new water racks and new gas piping for the generator, as well as a variety of lab gas systems, including nitrogen, CO2, and compressed air.
To ensure seamless operation, in-depth testing was performed to confirm system integrity and leak-free performance. This project also required careful coordination with the existing core and shell plumbing systems.
Location
Lexington, MA
Size
65,000 Sq. Ft.